Restoration is a tricky balance. We experience more main breaks in the winter months, when the temperatures drop outside, which makes paving the roads a little more challenging. Our crews try to schedule these jobs under optimal conditions as best they can, so the weather doesn’t interfere with the concrete curing process. Asphalt companies often suspend operations in the winter, making it harder to find the necessary materials. This typically requires Louisville Water to wait until mid-March for restoration efforts.
Why is timing so important for restoration?
- Updated